A list itemizing details of equipment that may need to be inspected and tested is known as?
Where IT equipment may be damaged by an applied voltage insulation resistance test, the test that would be carried out instead is?
When an item of equipment has passed all the required inspection and testing, the attached label should not contain the words?
Some electrical test equipment incorporates a test facility that is not recommended for in-service testing. This test facility is commonly known as; commonly known as;
A measurement of 25MΩ was produced after an insulation resistance test was performed on a Class ll hand-held item. Six months later a test performed on the same item of equipment produced a measurement of 4MΩ. This would indicate that the equipment is?
For standardisation, if a 230V appliance possesses an input rating of 650 W then the correct fuse size for the 3 pin plug would be?
For standardisation, if a 230V appliance possesses an input rating of 900 W then the correct fuse size for the 3 pin plug would be?
What is measured in Amps (Amperes)?
What is the minimum insulation resistance required for a Class I appliance?